Skip to main content

BEDDINGTON LANE: PHASE 2

Croydon

Following the successful completion of Phase 1 at Beddington Lane, and acquiring more employment land across the road, Prologis UK Ltd instructed MSA to design Phase 2. The site consists of 4 small industrial units in a mix
of sizes from 1,351 to 4,176 sq m within a 1.81 Hectare site. Units D5a & 5B are set in a small terrace with open yards to the front. Units DC6 & DC7 are stand-alone, with secure yards and parking areas.

The buildings use a similar palette of colours and materials to Phase 1, but with differing design details. The contemporary employment units utilise a variety of robust materials and colours to enhance the appearance of the area and continue the established
site-wide language from Phase 1. The core values of the development include efficiency and sustainability with the building’s specification exceeding statutory requirements and institutional standards.

BREEAM Outstanding achieved.

CLIENT

Prologis UK Ltd

OCCUPIER

Speculative

DATE

March 2024 – July 2025

SIZE

8,484 sq m (90,460 sq ft)

ROLE

Architects

BREEAM RATING

Outstanding